Indonesia's Copper Industry: From Concentrate Exporter to Copper Processing Hub

Indonesia's Copper Industry: From Concentrate Exporter to Copper Processing Hub

In the past two years, Indonesia has redrawn its copper map. National cathode refining capacity now exceeds 1.1 million tonnes a year by design, across three smelters: PT Freeport Indonesia's Manyar smelter in JIIPE, Gresik (about 600,000 tonnes), PT Smelting in Gresik (342,000 tonnes) and PT Amman Mineral Nusa Tenggara's smelter in Sumbawa (220,000 tonnes), which reached full operation in June 2026. The timing is good: LME copper traded around US$14,000 per tonne in August 2026, and the year-to-date average was about 39% above the same period of 2025.

The challenge is no longer refining copper. It is using it at home.

The paradox: plenty of cathode, little domestic use

According to PTFI President Director Tony Wenas, domestic demand for copper cathode is about 300,000–400,000 tonnes a year. PTFI has also said that of roughly 800,000 tonnes of cathode capacity, less than half is absorbed by Indonesian industry. About three-quarters of PT Smelting's output is still exported, mostly to Malaysia, Thailand and Vietnam.

In other words, neighboring countries turn Indonesian cathode into rod, wire, cable and tube, and some of those products return to Indonesia as imports. PTFI points to copper tube for air conditioners, which is not yet made in Indonesia despite its high copper content. Meanwhile, the domestic cable industry is said to need about 600,000 tonnes of copper a year.

The demand that is coming

Several large programs will push Indonesia's copper use higher:

  • The grid: RUPTL 2025–2034 targets nearly 48,000 km of transmission circuits and 108,000 MVA of substation capacity
  • Renewables: the 100 GWp Solar Power Program and 320 GWh of battery storage, which need copper cable, busbars and foil
  • EVs and batteries: battery cell plants in Karawang and Hailiang's copper foil plant in JIIPE, with potential cathode demand of about 100,000 tonnes a year

Downstream opportunities

Product

Used in

Demand driver

Copper rod

Feedstock for wire and cable

The whole cable and electrical industry

Power wire and cable

Transmission, distribution, building wiring

PLN grid, industrial estates, housing

Copper tube

Air conditioning, refrigeration, heat exchangers

Not yet produced domestically

Copper foil

EV batteries, PCBs

Battery and electronics plants

Enamelled wire and busbars

Motors, transformers, switchboards, data centers

Industrial electrification and renewables

Every tonne of cathode turned into finished products at home adds value and jobs, and cuts imports.

Why JIIPE

  • Cathode source inside the estate: the Manyar smelter is in JIIPE, and PT Smelting is in Gresik
  • A working ecosystem: Hailiang produces copper foil in JIIPE, proof that copper downstream plants can be built quickly here
  • A deep-sea port inside the estate for exporting copper products to Southeast Asia and beyond
  • Gresik SEZ incentives, including a 10- to 20-year tax holiday depending on investment size

Indonesia already refines its own copper. The next step is to use it. Talk to the JIIPE team about land, utilities and SEZ incentives for your copper rod, cable, tube or foil plant.


From Solar Materials to Manufacturing: Growing the Renewable Energy Ecosystem at JIIPE

Indonesia has an estimated 3,294 GW of solar potential, yet only about 1.49 GW of solar capacity was installed by the end of ...

Chemical Manufacturing at Scale: From Feedstock Access to Integrated Production

A chemical plant's competitiveness is decided by three costs: feedstock, energy and logistics. Indonesia still struggles on a...


Appointment for Industrial Land Acquisition /
Request for Proposal

This form is only for businesses genuinely interested in acquiring industrial land within JIIPE SEZ.
Please provide accurate details to help us assess your needs and offer the best solutions.

All fields marked with an asterisk (*) are mandatory

Basic Information

The reason for considering JIIPE ? *
(Ha)

Energy & Utility Needs
MW
m³/day
MMBTU/annum
Tons/Year